This contract is for the installation of a gas header at the Kekaha Municipal Solid Waste Landfill in Hawaii. The contract includes various line items, such as mobilization and demobilization, surveying, trench excavation and pipe placement, and pipe welding. The contract was awarded to ITC Water Management, Inc. for a total price of $499,869. The scope of work includes the installation of 6-inch and 12-inch HDPE pipes, as well as the provision of materials and labor for the project. Some key features of the contract include:
• Mobilization and demobilization
• Surveying
• Trench excavation and pipe placement
• Pipe welding
• Installation of 6-inch and 12-inch HDPE pipes
• Provision of materials and labor for the project
The contract is subject to the terms and conditions outlined in the General Provisions for Construction Contracts (GPCC) and the technical specifications provided.