The contract involves guide sign modifications, phase IV, along the Maine Turnpike from south of Exit 1 to north of Exit 19. The work includes removing, replacing, and installing new highway signs and sign overlays, as well as furnishing, installing, and salvaging aluminum signs, steel H-beam sign supports, concrete foundations, and maintenance of traffic. The contract also includes the installation of three ground-mounted dynamic message signs (DMS) on steel H-beams with solar power systems. The contractor is required to perform the work in accordance with the plans and specifications provided by the Maine Turnpike Authority.
Some key aspects of the contract include:
• The contractor must comply with all applicable laws and regulations, including those related to labor, safety, and environmental protection.
• The contractor must provide a bid bond, performance bond, and payment bond as required by the contract.
• The contract includes a liquidated damages clause, which provides for the payment of damages in the event of delays or non-compliance with the contract terms.
• The contractor must maintain a certified On-Site Responsible Party (OSRP) who has authority to implement Best Management Practices (BMPs) appropriately.
• The contract includes a Stormwater Awareness Plan, which outlines the requirements for stormwater management and pollution prevention.