This contract encompasses a comprehensive safety‑focused streetscape upgrade along Washington Street between 47th and 52nd avenues in Denver. The scope includes full‑depth roadway reconstruction, extensive sewer and storm‑drainage upgrades, expansion of right‑of‑way, installation of multi‑use sidewalks, green‑infrastructure planting, pedestrian lighting, new traffic signal infrastructure at 50th Street, and assorted decorative elements. The project is funded through the 2021 RISE Denver Bond Program and requires a 19 % DBE participation, with the selected contractor needing Heavy Civil pre‑qualification at the $50 M level. The work must be completed within a 640‑day performance period.
• Heavy‑civil roadway, utility, and drainage reconstruction (≈ $22.7 M award)
• Inclusion of pedestrian safety features, green infrastructure, and signal upgrades
• Mandatory DBE participation (19 %) and pre‑qualification at $50 M heavy‑civil level