The contract is for the AC Overlay Project SB1 2022 - Phase 3, with an estimated construction cost of $5,209,000. The project includes asphalt concrete overlay, base repair, rubberized asphalt concrete overlay or slurry seal, ADA curb ramps, traffic signal improvements, and restriping the roadway. The apparent low bidder is Granite Construction Company with a total bid of $4,722,350.47.
• The contract is for a construction project in Sacramento, California.
• The project has an estimated construction cost of $5,209,000.
• The apparent low bidder is Granite Construction Company.
• The project includes various construction activities such as asphalt concrete overlay and base repair.
• The contract was awarded through a competitive bidding process.