The Alaska Energy Authority contracted the removal of approximately 158 wooden poles on a 69 kV transmission line that runs from the Quartz Creek Substation to the Sterling Substation on the Kenai Peninsula. The work includes cutting or pulling pole butts, back‑filling holes with clean rock, limited vegetation clearing, and compliance with extensive environmental controls (wildlife refuge, wetland, and invasive‑species restrictions). The contractor must provide all labor, equipment, supervision, safety measures, and necessary permits, and must supply a 5 % bid bond and 100 % performance and payment bonds. Key contractual provisions include liquidated damages of $500 per day (capped at $10 k), DBE/EEO requirements, and a strict schedule for substantial completion (Sept 30 2023) and final completion (Nov 21 2023).
• Scope: Remove 158 69‑kV poles, conductors, and associated hardware; back‑fill with clean rock; perform erosion‑control and environmental mitigation.
• Logistics: Access by vehicle, foot, and helicopter; coordination with Kenai National Wildlife Refuge, Chugach National Forest, and local agencies.
• Financials: Engineer’s estimate $1.5‑$2.0 M; bid security 5 %; performance & payment bonds 100 % of contract price; $10 k liquidated‑damages cap.