This contract involves the trench‑less rehabilitation of municipal sanitary sewer service laterals using Cured‑In‑Place Pipe (CIPP) technology across multiple municipalities in Winnebago County, Illinois. The scope includes cleaning and televising 175 laterals, installing CIPP sleeves of various diameters (8‑ to 15‑inch tees), a short‑liner on a main line, service reinstatement work, and traffic‑control provisions. The work must be completed by March 31 2024 and includes a two‑year warranty on materials and workmanship. The agency (Four Rivers Sanitation Authority) awarded the contract to Performance Pipelining, Inc., which must provide the required performance and payment bonds, meet insurance minimums, and comply with Illinois prevailing‑wage, steel‑product, and environmental regulations.
• CIPP lateral reconstruction for 175 service laterals (various sizes).
• Required pre‑construction notifications, utility location, and traffic‑control compliance.
• Two‑year unconditional warranty; liquidated damages of $300 per day for late completion.