The Montana Department of Transportation (MDT) is seeking bids for the production and stockpiling of sanding material for the Great Falls 2A-locations. The contract requires the production of 4,500 tons or 3,000 cubic yards of sanding material, with the addition of 10% contractor-furnished salt by weight. The contractor must provide all labor, materials, equipment, and incidentals necessary to produce the sanding material and stockpile it at designated locations. The contract has a duration of 9 months, from July 1, 2025, to April 17, 2026. The MDT will provide the contract documents and specifications, and the contractor must comply with all requirements and regulations. Some key points to note include:
• The contractor must provide a quality control sampling and testing plan for production.
• The contractor is responsible for all sampling and testing for gradation and moisture during aggregate production.
• The contractor must use a minimum 60’ stacker belt to stockpile the material.
• The contractor must comply with all safety and environmental regulations.
• The contract includes provisions for partial payment and payment for additional work.
The MDT will conduct regular inspections and testing to ensure compliance with the contract specifications. The contractor must also participate in a preconstruction conference to discuss the project details and requirements.