The contract is for the installation of a new air conditioning system at the Topeka High School Weight Room. The system must be installed in accordance with all codes and authorities having jurisdiction, and the rooftop units must be Trane THD 120 E-480V or equal by York, Carrier, Lennox, or AAOV. The contract was awarded to three vendors: Lippert Mechanical Service Corp., Central Mechanical Construction Co., and Piping Contractors of Kansas (PCI). The bid opening date was December 7, 2016, and the total bid price for each vendor is as follows: Lippert Mechanical Service Corp. - $33,200.00, Central Mechanical Construction Co. - $40,950.00, and Piping Contractors of Kansas (PCI) - $46,350.00.
• The contract is for a lump sum price.
• The rooftop units must be Trane THD 120 E-480V or equal by York, Carrier, Lennox, or AAOV.
• The contract was awarded to three vendors.
• The bid opening date was December 7, 2016.