Awarded vendors
- Genesis Environmental Solutions
Description
The City of Independence, Missouri invited bids for the painting of Settling Basin No. 1 at the Courtney Bend Water Plant. The project involves surface preparation and application of new protective coating systems to the basin interior, exterior, and related appurtenances. The contract was awarded to Genesis Environmental Solutions and Blue MVP Painting, with a total price of $493,296.00. The scope of work includes providing all labor, equipment, and materials required for the project, as well as optional price adjustments for removal of basin flocculator steel parts and provision of SSPC Class 4A or better containment system. Key points to consider:
• The project requires surface preparation and application of new protective coating systems to the basin interior, exterior, and related appurtenances.
• The contract was awarded to Genesis Environmental Solutions and Blue MVP Painting.
• The total price of the contract is $493,296.00.
• The scope of work includes providing all labor, equipment, and materials required for the project.
• Optional price adjustments are available for removal of basin flocculator steel parts and provision of SSPC Class 4A or better containment system.