The contract is for the replacement of a septic system at 2391 Colon Drive, Copley, Ohio 44321. The contractor is required to install an NPDES compliant aerobic treatment unit, connect the downspouts, and pump and fill the existing septic system. The contractor must also provide all necessary permits and inspections. The contract is subject to Davis Bacon wage rates. The estimated cost of the project is $8,500. The contractor must attend a mandatory pre-bid meeting and visit the site prior to the meeting. The contractor must also provide proof of insurance and registration.
• The contract is for a single project, replacing a septic system.
• The contractor must install an NPDES compliant aerobic treatment unit.
• The contractor must connect the downspouts and pump and fill the existing septic system.
• The contractor must provide all necessary permits and inspections.
• The contract is subject to Davis Bacon wage rates.
• The estimated cost of the project is $8,500.