The Marlboro Street Rehabilitation Project involves the cleaning and CIPP lining of approximately 4,600 linear feet of existing 1920-era 14-inch cast iron water main, as well as the transfer of services, hydrants, and branch mains from a parallel 1890-era 6-inch main to the lined 14-inch main. The project also includes the replacement of approximately 1,850 linear feet of 4-inch, 6-inch, and 8-inch asbestos cement (AC) sewer mains and sub-mains with 8-inch PVC pipe, and the installation of approximately 1,650 linear feet of 12-inch and 15-inch HDPE storm drain and 6 precast drainage structures. The contract was awarded to S.U.R. Construction West, Inc. for the amount of $2,255,600.00.
• Cleaning and CIPP lining of existing water main
• Transfer of services, hydrants, and branch mains
• Replacement of sewer mains and sub-mains with PVC pipe
• Installation of HDPE storm drain and precast drainage structures
• Restoration of unpaved surfaces and lane striping
• Tree removal and planting