The contract involves the removal of six 20 ft diameter fiberglass tanks and replacement with 20 ft diameter concrete Octaform tanks in Pod C at the Wigwam Rearing Station. The replacement of plumbing fixtures and appurtenances will also be included. A bid alternate will include the removal of 2-20 ft diameter fiberglass tanks and replace with 20 ft diameter Octaform tanks in Pod D. The contract was awarded to LCI Construction with a total base bid and bid alternate #1 of $781,506.40. Key aspects of the project include a mandatory pre-bid meeting, bid submission through the Public Purchase online bidding system, and a bid deposit in the amount of Ten Percent (10%) of the total bid.
• The project requires the removal and replacement of fiberglass tanks with concrete Octaform tanks.
• The replacement of plumbing fixtures and appurtenances is included in the project scope.
• A bid alternate is included for the removal and replacement of additional tanks in Pod D.
• The contract was awarded to LCI Construction with a total base bid and bid alternate #1 of $781,506.40.
• A mandatory pre-bid meeting was conducted on December 8, 2022.
• Bids were submitted through the Public Purchase online bidding system.