The U.S. Coast Guard is seeking a qualified small‑business contractor to clean, inspect, and certify the two fuel service tanks aboard the Coast Guard Cutter Dolphin (WPB‑87354) at its home‑port in Mobile, AL. The work includes removal of approximately 1,400 gal of contaminated diesel from each tank, thorough interior cleaning, atmospheric testing, visual inspection in the presence of a Coast Guard Inspector, and re‑installation of new gaskets and stainless‑steel hardware. The contractor must provide all labor, equipment, waste‑disposal documentation, and a Plug Log, and must complete the effort within five business days of award, no later than 15 Dec 2026.
• Travel to Mobile, AL and on‑site execution at 1500 15th St., Mobile, AL 36615.
• Remove ~1,400 gal diesel per tank, dispose of fuel and cleaning waste per all regulations, maintain chain‑of‑custody records.
• Clean tank interiors, conduct atmospheric testing, perform visual inspection, replace gaskets (AMS‑C‑6183) and stainless‑steel fasteners, and conduct post‑service operational tests of tank level indicators and vent check valves.
• Provide full documentation (Plug Log, waste‑disposal records, cost breakdown) to the Coast Guard Engineer Petty Officer for final acceptance.