The contract is for the removal and replacement of a power pole at the Sheridan Game Bird Farm for the Wyoming Game and Fish Department. The contract was awarded to Delta Wye, and the bid award was issued on April 7, 2020. The contract process can take up to eight weeks after the bid award. The scope of work includes removing and replacing the power pole, and the contractor will be required to sign a contract and return it to the Wyoming Game and Fish Department.
• The contract is for a specific project at the Sheridan Game Bird Farm.
• The contractor will be required to remove and replace a power pole.
• The contract process can take up to eight weeks after the bid award.
• The contractor will be required to sign a contract and return it to the Wyoming Game and Fish Department.
• The bid award was issued on April 7, 2020.
• The contractor will be mailed a copy of the executed contract and a formal letter to proceed.