Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Illinois guideIllinois Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Illinois
  4. ›Water and Wastewater
  5. ›Huntington Blvd Water Main Replacement Project

Awarded contract·Village of Hoffman Estates·Illinois

Huntington Blvd Water Main Replacement Project

Won by H. Linden & Sons Sewer and Water, Inc$2.0MSingle Award
Contract source

Awarded vendors

  • H. Linden & Sons Sewer and Water, Inc

Description

The Village of Hoffman Estates contracted for the replacement of an approximately 2,800‑foot 18‑inch HDPE water main along Huntington Boulevard, including associated fire hydrants, valve vaults, and extensive site restoration. The project requires horizontal directional drilling, compliance with IDOT road‑construction standards, strict environmental safeguards for wetlands, and adherence to Illinois prevailing‑wage and apprenticeship rules. The contract was awarded through sealed‑bid competition and is priced on a unit‑price basis per foot of pipe and per item for ancillary works. • Scope: HDPE directional‑drilled water main (≈2,800 ft), fire hydrant/valve installation, erosion control, backfill, traffic‑control, testing, and final restoration. • Timeline: Bids due 4 Nov 2024; construction must be completed by 5 Sep 2025, with a 30‑day notice before start and a 9‑week construction window after mobilization. • Requirements: Minimum 5 years HDD experience (6 qualifying projects), equipment capable of ≥15,000 ft‑lb torque and 120,000 lb pull‑back, bid‑bond (5 % of bid), prevailing‑wage compliance, and documented apprenticeship participation.

Attached files

Key dates

Bids closed
11/4/2024
Contract modified
11/4/2024
Ends
9/5/2025
Duration
9 months

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Water Management and Sanitation
NAICS
237120
Solicitation №
Job Number 190796.01

Contract value

$2,043,535

The bid tabulation lists the Village’s engineered estimate at $2,043,535. The winning bidder’s total (shown in the tabulation) matches this figure, indicating the contract’s market value is essentially the engineered estimate. No alternate budget is disclosed, so the best reasonable estimate for the contract value is roughly $2.0 million. Factors influencing this figure include the length of HDPE pipe, the number of hydrants/valves, extensive erosion‑control work, and required testing and reporting.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Edgewater, FL·Florida

Top match · 77%

Silver Ridge Water Main Replacement

Closes 11/10/2026Opened 10/8/2026

Western Virginia Water Authority·Virginia

74% match

ITB - WYCLIFFE AVENUE WATERLINE REPLACEMENTS

Closes 12/2/2026Opened 10/23/2026

Hastings Utilities·Nebraska

74% match

Water Main Relocation St Joseph Ave from 7th to 8th Street HU 2026-43

Rolling / TBD closeOpened 5/4/2026

City of DeLand·Florida

74% match

2026 PARTS A-C, & F WALTS AVE & NEW ST WATER MAIN IMPROVEMENTS

Closes 11/12/2026Opened 10/9/2026

City of Bellevue·Washington

73% match

2027 Phase 1 Water Main Replacement

Closes 11/12/2026Opened 10/22/2026

Clermont County - Board of Commissioners·Ohio

73% match

Branch Hill Guinea Road Water Main Replacement (Branch Hill Miamiville Road to Loveland Miamiville Road)

Closes 11/19/2026Opened 10/21/2026

City of Holly Grove·Arkansas

73% match

Water System Improvements – Waterline Replacement

Closes 11/18/2026Opened 10/25/2026

Gwinnett County Government·Georgia

73% match

Ravenwood Drive Water Main Replacement

Closes 12/9/2026Opened 10/22/2026

Oregon Tualatin Valley Water District·Oregon

73% match

TVWD ITB 2027-004 176th & Sugar Plum Water Main Replacement

Closes 11/19/2026Opened 10/28/2026

Northern Kentucky Water District·Kentucky

73% match

Amsterdam Road Water Main Replacement

Closes 11/5/2026Opened 10/16/2026

Town of Eatonville·Florida

73% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

City of Ontario·California

73% match

UT 1065 FY2026-27 Water Main Improvements

Closes 11/18/2026Opened 10/14/2026

City of Charlotte·North Carolina

72% match

Fiscal Year 2026 Water Main Replacement

Rolling / TBD closeOpened 4/30/2026

City of Lake City and City of Bellechester·Minnesota

72% match

Lake City & Bellechester Lead Service Line Replacement Project

Closes 12/8/2026Opened 10/16/2026

City of Riverside·California

72% match

PARK AVENUE WATER TRANSMISSION MAIN REPLACEMENT

Closes 12/3/2026Opened 10/30/2026

City of Redlands·California

72% match

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

Gwinnett County Government·Georgia

72% match

Ravenwood Drive Water Main Replacement

Closes 12/9/2026Opened 10/27/2026

Goodwyn Mills Cawood·Georgia

72% match

Mechanicsville & Jones Mill Road Water Main Replacement

Closes 11/12/2026Opened 10/1/2026

City of Anderson, SC·South Carolina

71% match

Fulwer Street Waterline Replacement

Closes 11/19/2026Opened 10/16/2026

Oak Manor Municipal Utility District·Texas

71% match

Waterline Rehabilitation along Oak Trail, Oak Manor Drive, & Shady Oak Court

Closes 11/5/2026Opened 10/23/2026

City of Waukegan·Illinois

71% match

O'Plaine Road and I-94 Tollway Water Main Rehabilitation

Closes 11/3/2026Opened 10/22/2026

Northern Kentucky Water District·Kentucky

71% match

Amsterdam Road Water Main Replacement

Closes 1/31/2027Opened 10/13/2026

Gwinnett County Government·Georgia

71% match

Ravenwood Drive Water Main Replacement

Closes 12/9/2026Opened 10/21/2026

Georgia City of Cartersville·Georgia

71% match

Project: Mechanicsville & Jones Mill Road Water Main Replacement

Closes 11/12/2026Opened 10/1/2026

Bristol Virginia Utilities Authority·Virginia

71% match

CAST IRON WATER LINE REPLACEMENT PROJECT - PHASE 1

Closes 11/5/2026Opened 10/1/2026