The contract is for the separation of life-safety loads in the NMR building at the FSU National High Magnetic Field Laboratory. The project involves the addition of a distribution panel, supporting transformer, and the re-location of loads in several existing panels into two fully separate systems. The contract was awarded to Summit Electrical LLC for a total base bid of $140,990.00. The key information for this contract includes the scope of work, which is to provide emergency circuit reconfigure in the NMR wing of the NHMFL (MagLab), and the requirement to separate life safety loads from standby loads.
• The contract is for a specific project at the FSU National High Magnetic Field Laboratory.
• The project involves electrical services, including the addition of a distribution panel and supporting transformer.
• The contract was awarded through a competitive solicitation process.
• The total base bid for the contract is $140,990.00.
• The contract is subject to Florida Board of Governors regulations and FSU regulations.