The contract is for the supply and installation of a crane, as well as the repair and painting of a truck utility body. The preliminary bid tabulation shows that Jampa Crane 3 Body was awarded the contract with a total base bid amount of $23,504.00. The scope of work includes the installation of a hydraulic system, repair and paint of a service truck utility body, and furnishing and installing a new hydraulic crane on a 2009 F-350 service truck.
• The contract was awarded through an Invitation to Bid (ITB) process.
• The bid submission date was December 29, 2015, at 2:00 PM EST.
• The contract is subject to review and revision, and a final detailed bid tabulation will be published after a thorough review of all bid responses.