The contract is for the replacement of the roof at the Fire Academy, which is a two-and-a-half story building with several roof levels totaling approximately 17,000 square feet. The contractor is required to replace the existing EPDM membrane, remove and dispose of existing flashings, and install new flashings in accordance with manufacturer recommendations and industry standards. The contractor is also required to inspect and reuse all drains and coping stones where possible, and replace them where needed. The contract includes an alternate bid for the replacement of existing coping stones with a new 24-gauge steel coping system. The bid tabulation matrix shows the prices submitted by the vendors for each item, with PREMIER ROOFING SERVICES LLC being the lowest bidder.
• The contract requires the replacement of the roof at the Fire Academy
• The contractor must replace the existing EPDM membrane and install new flashings
• The contractor must inspect and reuse all drains and coping stones where possible, and replace them where needed
• The contract includes an alternate bid for the replacement of existing coping stones with a new 24-gauge steel coping system
• The bid tabulation matrix shows the prices submitted by the vendors for each item