This contract concerns the removal of an existing FM200 fire‑suppression system and the installation of a new fire‑alarm subsystem at the Mobile Technology Center in Mobile, Alabama. The City of Mobile issued an RFQ (SR‑031‑21) on May 21 2021, held a mandatory pre‑quote conference on May 26 2021, and accepted quotes through June 4 2021. The scope includes removal of legacy components (horns, pull stations, abort buttons, smoke detectors, control panel, FM200 tank) and installation of new detectors, pull stations, horns, and strobes onto an existing DMP XR500N fire‑alarm panel. The contract is short‑duration (14 calendar days) and is priced on a time‑and‑materials basis, with labor rates to be supplied by the contractor and a 15 % markup on parts. The award went to Professional Fire Protection Services, LLC.