The Arroyo Grande Creek Channel Emergency Levee Rehabilitation Phase 2A Project involves repairing levee damages caused by overtopping and seepage, including the installation of turf reinforcement mat on the landside slopes of the south levee to restore as-built conditions. The project has an engineer's estimate of $347,534.00. The contract was awarded to two vendors: Raminha Construction and Papich Construction Company, Inc. The scope of work includes construction surveying, traffic control systems, job site management, and the installation of aggregate base and turf reinforcing mat.
• The project requires the repair of levee damages caused by overtopping and seepage.
• The installation of turf reinforcement mat on the landside slopes of the south levee is necessary to restore as-built conditions.
• The project has an engineer's estimate of $347,534.00.
• The contract was awarded to two vendors: Raminha Construction and Papich Construction Company, Inc.
• The scope of work includes construction surveying, traffic control systems, job site management, and the installation of aggregate base and turf reinforcing mat.