This contract awards SEMA Construction, Inc. the preventive‑maintenance work for the Speer Boulevard Viaduct Bridge in Denver. The scope encompasses extensive bridge and roadway rehabilitation, including asphalt milling and resurfacing, concrete deck repair, structural steel painting, abutment and backwall replacement, expansion joint installation, erosion‑control measures, environmental health & safety services, and associated traffic and railroad coordination. The project is funded through the 2017 Elevate Denver Bond Program, with a total awarded value of roughly $17.3 million.
• Primary work categories: bridge deck resurfacing, structural steel repainting, concrete repair, and expansion‑joint installation.
• Supporting services: site clearing, vegetation management, sediment disposal, wildlife protection, and traffic/railroad coordination.
• Funding source: Elevate Denver 2017 General Obligation Bond Program; MWBE goal of 11 % participation.