The contract is for the construction of the Module 4, Phase 1 base liner system and related structures at the Kiefer Landfill. The work includes excavating and stockpiling soils, geosynthetics installation, and construction of the leachate collection and removal system. The estimated construction cost is $23,800,000. The contract requires a General Engineering Contractor, Class A license.
• The contract involves the construction of a base liner system and related structures
• The work includes excavating and stockpiling soils, geosynthetics installation, and construction of the leachate collection and removal system
• The estimated construction cost is $23,800,000
• The contract requires a General Engineering Contractor, Class A license
• A pre-bid meeting was held on August 13, 2019, at the Kiefer Landfill Engineering Office