The City of Columbia, Missouri, issued a request for quotation for the repair of the Boiler 6 Feed Water Pump. The scope of work includes picking up the pump, verifying the as-found inspection report, inspecting the pump split line joint, line boring the casing, renewing wear ring clearances, and reassembling the pump. The contract was awarded to multiple vendors, including Dubric Industries, Rotating Equipment, Sulzer, and IPEG. The contract value is estimated to be around $49,867 to $154,000, depending on the vendor and the scope of work.
• The contract involves the repair of a boiler feed water pump.
• The scope of work includes pickup, repair, and delivery of the pump.
• The contract was awarded to multiple vendors.
• The contract value is estimated to be around $49,867 to $154,000.
• The contract duration is not specified, but the repair work is expected to take no more than 6-8 weeks.