Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›AC Overlay SB1 Phase 2

Awarded contract·County of Sacramento - Construction·California

AC Overlay SB1 Phase 2

Won by Granite Construction Company$10.7MSingle Award
Contract source

Awarded vendors

  • Granite Construction Company

Description

This contract is for the AC Overlay SB1 Phase 2 project, which involves the furnishing of all labor, materials, and equipment for placing a conventional or rubberized asphalt concrete pavement overlay or slurry seal, repairing failed pavement, grinding the pavement, adjusting manholes to grade, installing sidewalk accessibility ramps, and placing pavement striping, markings, and markers. The estimated construction cost is $13,000,000. The contract was awarded to Granite Construction Company, who submitted the lowest bid of $10,723,172.00. • The project is located in Sacramento County, California. • The contract requires a Class A - General Engineering Contractor license. • The bid opening took place on May 2, 2019. • The contract is for construction services, including pavement overlay, repair, and maintenance. • The project includes multiple tasks, such as grinding, adjusting manholes, and installing accessibility ramps. • The contract has a significant estimated construction cost, indicating a large-scale project. • The contract was awarded through a competitive bidding process, with multiple contractors submitting bids.

Attached files

Key dates

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237310
Solicitation №
4437

Contract value

$10,723,172

The contract's estimated value is $10,723,172.00, as submitted by Granite Construction Company, the apparent low bidder. This amount is lower than the estimated construction cost of $13,000,000. The actual value of the contract may vary depending on the final scope of work and any potential change orders. Factors influencing the contract value include the cost of materials, labor, and equipment, as well as the complexity of the project. Given the information provided, the estimated value of the contract is likely to be around $10 million to $13 million.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

County of Okaloosa·Florida

Top match · 60%

Covered Walkway Phase 2

Closes 11/25/2026Opened 10/26/2026

U.S. Department Of Energy·California

59% match

Y--COTP Series Capacitor Two-Phase Design Build

Closes 11/13/2026Opened 10/20/2026

City of San Antonio·Texas

59% match

23-04203-05 2027 Street Rehabilitation Package 5 - Overlay

Closes 12/8/2026Opened 10/28/2026

Atlantic County Special Services School District·New Jersey

58% match

Bid 27-01 ACSSSD 18-21 Suite Addendum 1 (26.055 2026-09-10 )

Rolling / TBD closeOpened 9/10/2026

Santa Clara Valley Transportation Authority·California

58% match

Pre-Qualification: Overhead Contact System (OCS) Rehabilitation Project Phase 4A – Tasman West/East

Closes 11/13/2026Opened 9/30/2026

City of Bartlesville·Oklahoma

58% match

Bid 2026-2027-012 Spruce Ave. Overlay

Closes 11/23/2026Opened 10/31/2026

Illinois Tollway·Illinois

58% match

I-26-2064 - Asphalt Overlay & Pavement Marking

Closes 11/13/2026Opened 10/3/2026

City of San Antonio·Texas

58% match

23-04203-08 2027 Task Order Contract for Street Rehabilitation Package 8 – Overlay

Closes 12/1/2026Opened 10/28/2026

Texas City of San Antonio·Texas

57% match

2027 Street Rehabilitation Package 6 - Overlay

Closes 12/11/2026Opened 10/28/2026

State of Delaware DOT·Delaware

57% match

ADAMS STREET PATHWAY PHASE II

Closes 11/17/2026Opened 10/19/2026

City of West Sacramento·California

57% match

Corpyard Phase II - Concrete Ramp Coating

Closes 11/10/2026Opened 10/26/2026

City of Vernon·California

57% match

Atlantic Bridge Localized Pavement Repair & Bandini Blvd. Street Improvements -- Indiana Street to Sunol Drive

Closes 11/17/2026Opened 10/19/2026

Tacoma·Washington

57% match

E Portland Ave (64-72) Overlay

Closes 11/3/2026Opened 9/29/2026

City of Palmdale·California

57% match

Arterial Maintenance Overlay PMP

Closes 11/10/2026Opened 10/8/2026

Los Angeles County Public Works·California

57% match

RMD1402001 Hacienda Heights - Hacienda Boulevard Phase 1

Closes 11/17/2026Opened 10/20/2026

City of Santa Cruz·California

57% match

HSIP 11 & 12: UNSIGNALIZED CROSSING IMPROVEMENT PROJECT

Closes 11/5/2026Opened 10/21/2026

California Department of Transportation·California

57% match

Furnish and place polyester concrete overlays & replace joint seals.

Closes 11/5/2026Opened 10/5/2026

City of Napa·California

57% match

Citywide Striping - Phase 3

Closes 11/16/2026Opened 10/27/2026

California Department of Transportation·California

57% match

Replace AC Surf, RHMA overlay, drainage, curb ramps, & electrical.

Closes 11/10/2026Opened 9/21/2026

City of Salina·Kansas

57% match

Addendum%20%231%20North%20Ohio%20Overpass%20Painting

Rolling / TBD closeOpened 9/29/2026

City of San Antonio·Texas

57% match

23-04203-06 2027 Street Rehabilitation Package 6 - Overlay

Closes 12/11/2026Opened 10/28/2026

City of Salina·Kansas

57% match

North%20Ohio%20Overpass%20Q%26A

Rolling / TBD closeOpened 9/3/2026

California Department of Transportation·California

57% match

Cold plane AC Pvmt, RHMA-G overlay, landscape, Elect., and drainage.

Closes 12/16/2026Opened 10/26/2026

Texas City of San Antonio·Texas

57% match

2027 Street Rehabilitation Package 7 – Overlay

Closes 12/15/2026Opened 10/28/2026

California Department of Transportation·California

56% match

Bridge overlay, approach slab, joint seal, HMA, and cold plane.

Closes 11/10/2026Opened 10/12/2026