The Upper/Lower Wind River Water Systems Rehab project involves the abandonment of two underground pumphouses and the installation of two aboveground pumphouses at Boysen State Park in Wyoming. The project requires the contractor to tie the existing well into the new pumphouse and reattach the domestic and irrigation systems. The contract was awarded to three vendors: LCI Trucking and Construction, Rocky Mountain Sand & Gravel, and Wind River Oilfield Service. The bid document includes various requirements, such as a non-mandatory pre-bid meeting and the submission of bids through the Public Purchase online bidding system.
• The project requires the installation of precast concrete structures for the pumphouses.
• The contractor must submit a bid bond, cashier's check, or certified check as a bid deposit.
• The contract includes various documents, such as the bid bond response information form, special provisions, general provisions, and drawings.
• The contractor must comply with prevailing wages and other regulations.