The contract is for the construction of an ADA ramp at the Northwest Arts Center Office. The project includes the construction of a pathway from the parking lot, a temporary ramp system, expanded landing/porch with new steps, and a hand rail on the steps and landing. The contract was awarded to Spiritridge Construction Inc with a total quote of $19,800.40. The key features of the project include:
* Construction of a concrete pathway 48 inches wide from the curb cut to the landing
* Installation of a non-permanent, low maintenance ADA ramp with a slope not exceeding 1:12
* Construction of a porch with a base 6 inches deep and 5/8 inch crushed aggregate, compacted to 95 percent density
* Installation of a hand rail on the steps and landing, powder coated in gray.