The contract is for the NE Bellevue Crosswalk Improvements project, which includes the installation of rectangular rapid flashing beacons, construction of cement concrete curb and gutter, and other improvements. The contract was awarded to multiple vendors, with a total bid amount of $1,197,863. The project is funded in part by the Federal Highway Administration (FHWA) and is required to meet the contract provisions for Federal Aid Construction Contract. The scope of work includes conducting traffic control, removing structures and obstructions, installing illumination and speed feedback signs, and constructing cement concrete sidewalk and median islands.
• The project includes the installation of rectangular rapid flashing beacons at three locations.
• The contract requires the vendors to conduct traffic control and remove structures and obstructions.
• The project includes the construction of cement concrete curb and gutter, as well as the installation of illumination and speed feedback signs.
• The vendors are required to construct cement concrete sidewalk and median islands, as well as update ADA ramps.
• The project includes storm drainage improvements, grinding and overlay of pavement, and permanent signing.