This contract awards the City of Dothan the provision and installation of a complete urban tree planting system for the 300‑block of Foster Street. The scope includes supplying root‑space uprights, airflow lids, geocomposite fabrics, ribbed root barriers, moisture barriers, arborvent vents, starburst tree grates, delivery, and associated soil cell systems, as well as the associated installation hardware. The negotiated total price for the primary configuration is $84,571.68, with an alternate subtotal of $89,560.83. Payment terms require a 50 % deposit and the balance due by a 15‑day post‑dated check prior to shipping, subject to a credit application. The award was made after an open competition, with bid opening on 11 Nov 2022 and the award finalized on 12 Dec 2022.
• Supplies all hardware needed for urban tree planting (root barriers, soil cells, irrigation/aeration components, grates).
• Total contract value approximately $85 k; pricing is itemized on a unit‑price basis.
• Single‑vendor award to GreenBlue Urban America, Inc., a Knoxville‑based supplier.