The contract is for Mechanical Improvements at 297 Booster Station and Inglewood Lift Station, which includes the installation of new ductile iron pipe and control valve, and the installation of a new 18-inch plug valve and modification to an existing 12-inch plug valve. The project has an engineering estimate of $30,000. The contract was bid on by Westerlund Excavation LLC and Gary Harper Construction, LLC.
• The project involves mechanical improvements at two locations: 297 Booster Station and Inglewood Lift Station.
• The work includes the installation of new piping and valves.
• The project has an engineering estimate of $30,000.
• The contract was bid on by two vendors: Westerlund Excavation LLC and Gary Harper Construction, LLC.