Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Colorado guideColorado Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Colorado
  4. ›Construction
  5. ›Marston Lake North Upstream of Glenbrook Pond Phase 2

Awarded contract·City and County of Denver·Colorado

Marston Lake North Upstream of Glenbrook Pond Phase 2

Won by Hamon Infrastructure, Inc.$3.4MAwarded 1/30/2025Single Award
Contract source

Awarded vendors

  • Hamon Infrastructure, Inc.

Description

The Marston Lake North Upstream of Glenbrook Pond – Phase 2 project is a municipal infrastructure improvement aimed at separating storm‑water from the Bowles Lateral irrigation ditch, enhancing drainage, reducing groundwater issues, and decreasing street‑flow in the Marston Lake area. Phase 2 expands on Phase 1 (completed 2023) by installing large‑diameter storm‑water mains (30‑ to 42‑in. circular and 34 × 53‑in. elliptical), associated laterals, inlets, manholes, water‑line adjustments, and full curb‑gutter‑sidewalk replacement, as well as street restoration. The contract is a competitive sealed‑bid awarded to Hamon Infrastructure, Inc. for a total value of $3.35 M, with an engineer’s estimate of roughly $3.02 M. The work is classified under Category 1E(4) – Piped Sewer, requiring a pre‑qualification threshold of $6 M, and includes a 14 % MWBE participation goal. Bids were submitted via the Rocky Mountain E‑Purchasing (BidNet) system, with a bid‑opening teleconference on 31 Oct 2024. The project schedule is 230 days from notice to proceed. • Scope: 30‑ to 42‑in. circular storm mains, 34 × 53‑in. elliptical pipe, storm laterals, inlets, manholes, water‑line adjustments, curb‑gutter‑sidewalk replacement, street restoration. • Budget: Engineer’s estimate $3.02 M; awarded bid $3.35 M. • Procurement: Full open competition; MWBE goal 14 %; pre‑qualification $6 M.

Attached files

Key dates

Bids closed
10/31/2024
Intent to award
1/30/2025
Awarded
1/30/2025
Contract modified
10/17/2024
Starts
1/30/2025
Duration
230 days

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237120
Solicitation №
202475774

Contract value

$3,350,000

Contract value as stated on the site: $3,350,000.00

Similar open opportunities

Matched by Bid Banana AI™

Manatee County - Purchasing Division·Florida

Top match · 60%

LAKE MANATEE UTILITY AIRBOAT RAMP AND DOCK

Closes 12/11/2026Opened 10/16/2026

U.S. Department Of Defense·South Dakota

60% match

LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2

Closes 12/3/2026Opened 10/16/2026

Town of Eatonville·Florida

60% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

City of North Charleston·South Carolina

59% match

Northwoods Estates Pond Improvements (REVISION)

Closes 11/17/2026Opened 10/16/2026

U.P. Engineers & Architects, Inc·Michigan

59% match

Adams Township Water Tank

Closes 11/24/2026Opened 10/30/2026

Connecticut Town of Simsbury·Connecticut

58% match

Curtiss Park Trail State Project No. 128-158

Closes 11/17/2026Opened 10/15/2026

City of Valdosta·Georgia

58% match

Lakeland Avenue Drainage Improvements

Closes 12/1/2026Opened 8/27/2026

City of Prior Lake·Minnesota

58% match

2026-2027 Pond Maintenance Project

Closes 11/19/2026Opened 10/30/2026

City of North Charleston·South Carolina

58% match

Northwoods Estates Pond Improvements

Closes 11/3/2026Opened 10/5/2026

County of Dane·Wisconsin

58% match

Lake Accessibility & Stormwater Improvements - Babcock Park

Closes 11/17/2026Opened 9/29/2026

Alaska Department of Transportation & Public Facilities·Alaska

58% match

RTP Grant Application - Yellow Hill Lake Trail

Rolling / TBD closeOpened 9/24/2026

Massachusetts Department of Conservation and Recreation·Massachusetts

58% match

DCR 931 Lakes & Ponds Design, Assessment and Management

Closes 5/30/2029Opened 3/11/2024

City of Charlotte·North Carolina

58% match

Gleneagles Storm Drainage Improvement Project

Rolling / TBD closeOpened 3/23/2026

City of Farmington·New Mexico

58% match

Civitan Park Pond Outlet Structure and Conduit Replacement

Closes 11/19/2026Opened 10/21/2026

Georgia City of Valdosta·Georgia

58% match

Lakeland Avenue Drainage Improvements

Closes 12/1/2026Opened 8/27/2026

City of North Charleston·South Carolina

58% match

Northwood Estates Pond Improvements

Closes 11/17/2026Opened 10/2/2026

Virginia Polytechnic Institute and State University·Virginia

58% match

VT Duck Pond Water Quality Improvements – Pond Edge Restoration

Closes 11/3/2026Opened 10/6/2026

Virginia Polytechnic Institute and State University·Virginia

58% match

VT Duck Pond Water Quality Improvements – Pond Edge Restoration

Closes 11/10/2026Opened 10/6/2026

Town of Hilton Head Island·South Carolina

57% match

Crossings Park Improvements Phase 2-Skate Park and Pump Track

Closes 12/10/2026Opened 10/26/2026