The contract is for the Aurora Harbor Rebuild, Phase III, which includes the fabrication and installation of mooring floats, steel piles, and finger floats, as well as the refurbishment of the existing gangway landing float and the existing gangway. The engineer's estimate for the project is between $3,500,000 and $4,000,000. The contract was awarded to Trucano Construction Company, with a base bid of $4,269,650. The project includes various pay items, such as mobilization, demolition and disposal, domestic water system and appurtenances, and electrical utility building.
• The project includes the installation of 4500 square feet of mooring floats, four 12.75” diameter steel piles, and twenty-one 16” diameter steel piles.
• The project also includes the refurbishment of the existing gangway landing float and the existing gangway.
• The contract includes various alternate bids, such as Alternate No. A, Alternate No. B, Alternate No. C, and Alternate No. D.
• The contract has a total bid of $5,664,850 for Trucano Construction Company.