This contract is a City‑issued Request for Bid for the demolition of the existing pier serving the Best Western Plus Coastline Inn on Wilmington’s Riverfront. The work includes utility disconnection, removal of timber and steel pier elements, cutting piles, disposing of debris (including hazardous materials), installing erosion‑control measures, and back‑filling with a new concrete pad. The contractor must submit a mobilization payment (≤ 5 % of total contract), adhere to a 90‑day completion schedule, and provide a one‑year warranty on workmanship. A minimum of 14 % of the prime‑contract value must be subcontracted to MWBE firms, and the contractor must supply all required insurance, bonds, and safety plans.
• Scope: selective demolition, pile removal, concrete work, site grading, and environmental compliance.
• Schedule: bids due June 27 2024; contract award pending; work must commence within 45 days of NTP and be finished within 90 days.
• Requirements: MWBE subcontracting (14 %), CGL $3 M, workers’ comp $3 M/ $53 M, performance bond, hurricane preparedness plan, erosion‑control, and waste disposal to EPA‑approved landfill.