The contract is for the maintenance of the FDOT Multi-Use Trail System, which is a 12-foot-wide asphalt path along State Road 442 (Indian River Boulevard) from east of Interstate 95 to Air Park Road for approximately 1.82 miles. The City of Edgewater is responsible for the maintenance of the trail, including vegetation management, removal of graffiti, and repair of trail-related slope erosion. The Florida Department of Transportation is responsible for the construction and oversight of the project. The contract includes provisions for the maintenance of the trail, including the repair of trail-related structural and safety features, and the removal of debris and litter. The contract also includes provisions for the termination of the agreement, including the failure of the City of Edgewater to perform its duties under the agreement. Some key points about this contract include:
• The trail is 12 feet wide and 1.82 miles long
• The City of Edgewater is responsible for maintenance
• The FDOT is responsible for construction and oversight
• The contract includes provisions for termination
• The contract is for the maintenance of the trail, not the construction
• The City of Edgewater must perform its duties under the agreement or risk termination