This contract is for lead abatement at 688 Carlysle St. Akron, Ohio 44310. The work includes paint stabilization, window replacement, and other repairs. The contract has a duration of 30 days and a total value of $45,835.00. The contractor must follow all applicable local building codes and regulations, including OSHA, City, County, and state codes, as well as the Ohio Department of Development Residential Rehab Standards. The contractor must also provide all necessary labor, materials, services, and equipment to complete the work. Some key points about the job's work and scope-of-work include:
* Basement stairwell skirt board and ledge-side A-paint stabilize in accordance with HUD regulations
* Rear foyer walls-all sides-enclose house with house wrap and install vinyl siding
* Rear foyer ceiling-enclose ceiling with white vinyl soffit and wrap beam with white coil stock and caulk all seams
* Rear foyer door casings and frame-sides A and C-enclose casings with white coil stock and caulk all seams
* 2nd floor sunroom window casings and sills-paint stabilize in accordance with HUD regulations
* 2nd floor sunroom walls-sides B, C and D-paint stabilize in accordance with HUD regulations
* 2nd floor sunroom door casing-side A-paint stabilize in accordance with HUD regulations
* Attic walls-repair wall with water damage--paint stabilize all sides in accordance with HUD regulations, only paint where water damage is and feather in painting to match
* Living room-side D-windows
* 2nd floor bathroom-side D windows
* 2nd floor sunroom-sides A, B and C-windows
* Attic-sides B, C and D windows
* Garage-side D-windows
* Front porch beams-sides A, B and D wrap with coil stock, caulk all seams, no sharp edges
* Garage doors-side C-remove and replace with barn doors with lock
* Garage interior walls-sides B, C and D-paint stabilize in accordance with HUD regulations
* Side B exterior door-door, door stop, jamb and threshold -remove and replace with steel pre-primed pre-hung door with weather stripping and a dead bolt
* Exterior window casings and doors-side D
* Install smoke detector in each sleeping area and on each floor-10 year battery operated dual sensor photoelectric and ionization smoke alarm-allowance $30/alarm materials and labor
* Install battery operated or plug in CO detector in basement and by sleeping areas . Allowance $50 materials and labor
* Rear foyer floor HUD cycle clean, allowance $200
* Clean entire unit in accordance with EPA/RRP and CDC Guidelines for Covid-19
* Bedroom #3 replace window
* Bathroom window replace with frosted glass
* Replace front door with solid steel insulated door with deadbolt
* Kitchen ceiling repair and repaint, flat white entire ceiling
* Replace kitchen cabinets with entry level Hampton Bay cabinets, white
* New roof entire home
The winning bidder must follow COVID protocols when on the job site at all times and must complete the work within 5-7 days of starting, within a 30-day contract.