The Folsom Boulevard Complete Streets Phase 1 project involves the furnishing of all labor, materials, and equipment for clearing and grubbing, installation of curbs, sidewalk, asphalt pavement, water, sanitary sewer, drainage construction, retaining walls, fencing, traffic signal equipment modifications, slurry seal, traffic striping, street lighting, landscaping, irrigation, and doing all other work specified on the plans and in the specifications. The estimated construction cost is $5,400,000.00. The contract was awarded to the apparent low bidder, Sierra National Construction, Inc., with a total bid of $4,715,469.80.
• The project includes multiple components such as clearing and grubbing, installation of curbs, sidewalk, asphalt pavement, and more.
• The estimated construction cost is $5,400,000.00.
• The contract was awarded to Sierra National Construction, Inc.
• The project is located in Sacramento, California.
• The contract is for a General Engineering Contractor, Class A.
• The bid opening was held on November 4, 2021, and the bids were received from five firms.