This contract is for the design‑build rehabilitation of approximately 11,300 linear feet of sanitary sewer located in wooded easements in Bloomfield, Connecticut. The work includes trenchless Cured‑in‑Place Pipe (CIPP) lining of the sewer lines and cementitious lining of roughly 1,200 vertical feet of manholes, together with all labor, equipment, permits, and related accessories required to complete the job. Bidders were required to hold a current DAS Contractor Pre‑Qualification Certificate for sewer and water lines and to submit the certification with their sealed bids. A mandatory pre‑bid conference was held on March 6, 2023, and all bids were due March 30, 2023. The Metropolitan District will act as the contracting agency, overseeing the project through its District Clerk office in Hartford.
• Scope: trenchless pipe‑rehabilitation (CIPP) + cementitious manhole lining (~11,300 ft sewer, ~1,200 ft manholes).
• Requirements: DAS pre‑qualification, sealed bid process, mandatory pre‑bid conference attendance.
• Timeline: Bids due 30 Mar 2023; award announced 27 Jun 2024.
Attached files
The award documents live at the source — open the contract source above to download them.