The contract is for the abandonment and demolition of an irrigation well, including the removal of a 5000-gallon hydro-pneumatic tank and capping of distribution reuse lines. The project also involves the demolition of four concrete block walls and the removal of an existing control panel. The contract was awarded to three vendors: Petrotech Southeast, Inc., Parsons Drilling Corp, and Atlantic Site Develop. The base bid amounts for the vendors were $38,440.00, $150,000.00, and $40,900.00, respectively.
• The project requires the abandonment and plugging of an existing well.
• The removal of a 5000-gallon hydro-pneumatic tank is included in the project.
• The capping of distribution reuse lines is part of the project.
• The demolition of four concrete block walls is required.
• The removal of an existing control panel is included in the project.