The contract is for the installation of a 2.5 MW, 12.47kV, 3-phase diesel generator, sound attenuating environmental enclosure, generator base fuel tank, and outdoor rated switchgear near the American River Pump Station. The work includes site preparation, clearing and grubbing, surface and subsurface improvements, electrical work, and equipment installation. The contract was awarded to Lorang Brothers Construction, Inc. for a bid price of $2,333,900.
• The contract includes a mandatory pre-bid walk-through meeting and a project walk-through.
• The contractor is responsible for mobilization, demobilization, and site preparation.
• The contract includes various line items, such as underground electrical, overhead electrical, site electrical, and equipment installation.
• The contract has a total bid price of $2,333,900, with an engineer's estimate of $2,000,000.