This contract is for drainage improvements in the Cloverleaf Area for the Harris County Flood Control District. The project includes regrading and redesigning roadside ditches, constructing culvert boxes, and installing a stormwater trunk line. The contract was awarded to Main Lane Industries, Ltd. for $13,947,205. The project is expected to provide drainage relief to the northern portion of the Cloverleaf neighborhood. Key features of the project include:
• Regrading and redesign of roadside ditches
• Construction of culvert boxes
• Installation of a stormwater trunk line
• Improvement of the internal ditch system
• Installation of lateral tie-ins from roadside ditches
The contract is for a period of one year, starting from August 8, 2023, and ending on August 7, 2024.