The Palmdale Water District issued a bid for the construction of a domestic water meter change-out in various areas within the district's primary service area. The bid was won by Bob O Construction with a lump sum total of $144,442.60. The project involves the removal and installation of new water meters, including 3/4 inch, 1 inch, 1 1/2 inch, and 2 inch meters. The engineer's estimate for the project was $138,000.00.
• The project involves the removal and installation of new water meters
• The bid was won by Bob O Construction
• The lump sum total for the project is $144,442.60
• The engineer's estimate for the project was $138,000.00