The Snohomish County Public Works agency awarded a competitive public‑works contract to replace and repair a culvert on the Centennial Trail. The scope includes full removal of existing pipe, trail and footbridge demolition, site preparation, grading, installation of HDPE and steel culvert pipes, asphalt surfacing, erosion control measures, and environmental mitigation such as plant restoration and fish‑exclusion. The winning bid (Kamins Construction) totaled approximately $584 K, reflecting a lump‑sum price for a comprehensive civil‑construction effort.
• Project involves excavation, pipe installation, roadwork, drainage, and environmental restoration.
• Required compliance with Washington wage‑payment statutes, non‑collusion declaration, and a 5 % bid bond.
• Open competition attracted seven bidders; the contract was awarded on June 24 2020 after the bid deadline of June 2 2020.