The contract is for the rehabilitation of the Lake Heights Wastewater Pump Station. The work includes improving private driveway passage, removing and replacing existing wetwell and overflow lid and hatches, installing new submersible duplex pumps, and other miscellaneous items. The engineers' estimate for the project is between $630,000 and $760,000. The contract was awarded to multiple vendors, with the lowest bid being $624,986.25. The project involves various tasks such as clearing and grubbing, demolition of existing pump station appurtenances, removal of existing controls building, and installation of new electrical components.
• The project requires the removal and replacement of existing wetwell and overflow lid and hatches.
• The installation of new submersible duplex pumps and guide rails is necessary.
• The project involves the construction of a new controls building and the installation of HVAC exhaust and supply.
• The contract includes the installation of a reduced pressure backflow preventer, meter, and hot box.
• Bypass pumping is required to complete the work.
• Other miscellaneous items are included in the project.