Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Washington guideWashington Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Washington
  4. ›Construction
  5. ›Steel Structures for Bavarian Substation

Awarded contract·Chelan County PUD·Washington

Steel Structures for Bavarian Substation

Won by Blackwater Industries PLLC$257kSingle Award
Contract source

Awarded vendors

  • Blackwater Industries PLLC

Description

The Chelan‑Puget District issued a materials solicitation to provide and install steel structures for the Bavarian Substation. After a competitive bid opening on December 19 2023, Blackwater Industries PLLC was awarded the contract with a bid of $257,432.68, below the agency’s $300,000 estimate. The work involves fabricating and erecting steel framework components essential to substation infrastructure, likely including foundations, steel towers, and support structures. This modest‑scale ($≈ $260 k) project is typical of utility‑sector capital upgrades and offers a clear entry point for firms specializing in steel‑structure fabrication and installation. • Scope: Fabrication and installation of steel structures for a substation. • Awarded Vendor: Blackwater Industries PLLC (single‑award). • Estimated Value: $300 k (award ~$257 k). • Procurement Method: Competitive sealed bidding (full open competition).

Attached files

Key dates

Bids closed
12/19/2023

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237130
Solicitation №
23-13198

Contract value

$257,433

The solicitation’s “SolicitationBallparkEstimate” is $300,000, and the awarded bid from Blackwater Industries PLLC is $257,432.68. Since the contract was awarded at that amount, the realistic contract value is roughly $257,433. The estimate range (≈ $250‑$315 k) reflects typical market rates for steel‑structure fabrication and installation on a substation of this size. No additional options, extensions, or change orders are mentioned, so the final contract value should be considered the awarded bid amount.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Springfield·Illinois

Top match · 67%

Alpha Substation Construction (J1610 Project)

Closes 11/5/2026Opened 10/6/2026

NYS MTA - Metro-North Railroad·New York

66% match

REPLACEMENT OF SEVEN (7) POWER SUBSTATION ROOFS

Closes 11/17/2026Opened 10/2/2026

Rochester Public Utilities·Minnesota

65% match

Power Transformer - Zumbro River Substation

Closes 11/23/2026Opened 10/13/2026

City of Danville·Virginia

65% match

QB 26-27-016 Swedwood Subtation Package - Bid Tab

Closes 11/8/2026Opened 10/28/2026

City of Gallup·New Mexico

65% match

Turnkey-Engineering, Procurement and Construction (EPC) for New Carbon Coal Electrical Substation

Closes 11/6/2026Opened 7/24/2026

University of Maryland - Baltimore·Maryland

65% match

Electrical Substation Expansion and Improvements at Towson University

Closes 12/8/2026Opened 10/28/2026

Kent State University - Office of the University Architect·Ohio

65% match

Tri‑Towers Steam Line Replacement – KSU‑22L078

Closes 11/17/2026Opened 10/21/2026

Maryland Transit Administration·Maryland

65% match

Metro Traction Power Substation Emergency Trip Stations (TPSS ETS) Installation at Various Locations [T-1564-0150]

Closes 11/19/2026Opened 10/1/2026

City of Springfield·Illinois

64% match

Transmission Line Construction (J1610 Project)

Closes 11/5/2026Opened 10/6/2026

City of Orangeburg·South Carolina

64% match

Utility Transmission & Distribution System Construction & Maintenance

Closes 12/2/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

64% match

Request for Information (RFI) - Local Construction Subcontractors for Spangdahlem AB MACC

Closes 4/30/2027Opened 4/28/2026

Imperial Irrigation District·California

64% match

Construction Services for Protection Relays Replacement Programs

Closes 11/24/2026Opened 9/29/2026

Snohomish County PUD·Washington

64% match

Canyon Park Substation Dead End & Strain Bus Support Structures and Anchorage

Closes 11/10/2026Opened 10/27/2026

Hastings Utilities·Nebraska

64% match

DHPC PDC 13.8KV Switchgear (Re-bid) HU 2026-49

Rolling / TBD closeOpened 9/4/2026

U.S. Department Of Defense·United States of America

64% match

Vegetation Control_Embankments, Weed Control Railroad Tracks, USAG Bavaria

Closes 11/2/2026Opened 10/1/2026

Austin Energy·Texas

63% match

Distribution Getaway Duct Bank Bore at East Village subst

Rolling / TBD closeOpened 7/21/2025

Iowa State University·Iowa

63% match

CP1269515-Utilities-Pearson Substation-4.16kV Switchgear and Cable Infrastructure Upgrade

Closes 11/3/2026Opened 10/6/2026

City of Hanska·Minnesota

63% match

Hanska City 100,000‑Gallon Elevated Water Storage Tank Construction

Closes 11/23/2026Opened 10/23/2026

City of Richland·Washington

63% match

Metalclad Switchgear - Sandhill Crane Substation Bank 3

Closes 11/3/2026Opened 9/27/2026

City of Richland·Washington

63% match

Tapteal Substation Bank 2 Oil Leak Repair

Closes 11/6/2026Opened 10/1/2026

Eastern Kentucky University·Kentucky

63% match

Trade Service Agreement - Substation Breaker Maintenance

Closes 11/6/2026Opened 10/19/2026

City of Pasadena·California

63% match

Mobile Substation Project

Closes 11/16/2026Opened 9/2/2026

Northeast Wisconsin Technical College·Wisconsin

63% match

Aurora Roof Replacement

Closes 11/10/2026Opened 10/19/2026

City of Cincinnati·Ohio

63% match

Hopple Street HAM CR 163 5.5 - PID 121735

Closes 11/12/2026Opened 9/10/2026

NYS Rochester-Genesee Reg. Transportation Authority·New York

63% match

Fueling Station Electrical Distribution Upgrades

Closes 11/20/2026Opened 10/26/2026