This contract calls for comprehensive environmental remediation of the basement breakroom at the Ben May Main Library in Mobile, AL. The work includes full‑scale cleaning, disinfection, removal of contaminated drywall, HEPA‑vacuuming, installation of air scrubbers, and final encapsulation paint, all performed under EPA/IICRC‑approved methodologies. The contractor must provide all labor, materials, equipment, PPE, and insurance, maintain air changes for at least 24 hours post‑remediation, and adhere to COVID‑19 safety protocols. A $500 allowance is set for unforeseen conditions, and bid security of 5 % (max $10,000) applies for quotes of $15,000 or more. The contract term is ten calendar days from the Notice to Proceed, with the award decided after a mandatory pre‑quote conference on November 4, 2021.
• Scope: destructive remediation, HEPA‑vacuuming, disinfection, replacement of drywall, encapsulation paint, air‑scrubber operation.
• Requirements: Minimum three‑year commercial remediation experience, relevant certifications, possible Alabama General Contractor’s License if total cost exceeds $50,000, and compliance with insurance, E‑Verify, and COVID‑19 guidelines.
• Financials: $500 allowance, 5 % bid security (capped at $10k), quarterly payments upon completion, and no tax‑exempt status.