The contract is for drainage improvements within the High Meadows and Fairgreen Subdivision in Harris County, Texas. The project involves the construction of approximately 4,790 linear feet of reinforced concrete pipe, inlets, manholes, junction boxes, culvert outfalls, and other drainage infrastructure. The contract was awarded to J Rivas Construction, LLC, with a total value of $3,313,926. The project aims to reduce flood risk and strengthen resiliency in the area. Some key features of the project include:
• Construction of drainage infrastructure, including pipes, inlets, and manholes
• Installation of flow regulators and other drainage control measures
• Removal and disposal of existing concrete and other materials
• Construction of new driveways and sidewalks
• Implementation of erosion control measures, including sodding and hydro-mulching
The contract is expected to last for one year, from June 6, 2023, to June 6, 2024.