Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Civil Engineering
  5. ›Mandalay Bay Seawall Repair Feasibility Study and…

Awarded contract·City of Oxnard·California

Mandalay Bay Seawall Repair Feasibility Study and Construction Documentation for 3900-3966 West Hemlock Street

Won by Tetra Tech, Inc.$1MSingle Award
Contract source

Awarded vendors

  • Tetra Tech, Inc.

Description

The City of Oxnard has awarded a contract to Tetra Tech, Inc. for the Mandalay Bay Seawall Repair Feasibility Study and Construction Documentation. The project involves the assessment of drilled-hole passive soil anchors and the incidental work needed to remove, store, and replace portions of the nine dock platforms that are presently fixed to the existing seawall. The proposed wall is to be designed to be installed immediately in front of the existing wall and account for the existing 30’ battered timber piles spaced at 7.5’ on center along the seawall. The existing concrete panel seawall and tieback system are to remain in place. • The project is located at 3900-3966 West Hemlock Street in Oxnard, CA. • The City of Oxnard posted the RFP on November 21, 2018, and the bid submission date was December 10, 2018. • A pre-bid conference was held on December 3, 2018, at the Seabridge Marina, D Dock. • The contract was awarded to Tetra Tech, Inc. on April 16, 2019.

Attached files

Key dates

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Civil Engineering
NAICS
541330
Solicitation №
PW 19-25R

Contract value

$1,000,000

The value of this contract is not explicitly stated in the documents. However, based on the scope of work, which includes the assessment of drilled-hole passive soil anchors and the design of a new seawall, the value of the contract could be in the range of $500,000 to $2 million. This estimate is based on the fact that the project involves a significant amount of engineering and design work, as well as the potential for construction costs.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Seattle·Washington

Top match · 74%

Request Seawall Data Room Access

Closes 12/31/2026Opened 9/29/2026

City of New York Department of Parks and Recreation·New York

74% match

CNYG-223M Citywide Seawall Reconstruction

Closes 11/16/2026Opened 9/3/2026

New York City Department of Parks and Recreation·New York

74% match

M289-120M East River Esplanade E36-38 St Seawall Reconstruct

Closes 11/19/2026Opened 10/16/2026

New York City Department of Parks & Recreation·New York

74% match

M289-120M East River Esplanade E36-38 St Seawall Reconstruct

Closes 11/2/2026Opened 9/21/2026

County of Volusia·Florida

74% match

Seaview Vehicular Beach Access Ramp Reconstruction Project

Closes 11/5/2026Opened 9/29/2026

City and County of San Francisco·California

73% match

EXT REC | CON26-0014 Marina Seawall - MLBE

Closes 12/31/2027Opened 1/16/2026

New York City Department of Parks and Recreation·New York

73% match

M289-120M East River Esplanade E36-38 St Seawall Reconstruction

Closes 11/2/2026Opened 9/21/2026

Town of Highland Beach·Florida

72% match

Marine Access Facility Construction

Closes 11/12/2026Opened 10/9/2026

U.S. Department Of Commerce·Mississippi

72% match

Design-Build Repair and Renovation of the Gulf Marine Service Facility (GMSF) & Wharf Repairs, in Pascagoula, Mississippi

Closes 11/13/2026Opened 10/27/2026

U.S. Department Of Homeland Security·Virginia

71% match

USCGC JOSEPH TEZANOS DRYDOCK AVAILABILITY FY2027

Closes 10/12/2027Opened 9/29/2026

County of Volusia·Florida

71% match

River Beach Drive Vehicular Beach Access Ramp Reconstruction Project

Closes 11/5/2026Opened 9/29/2026

Hawaii Department of Land and Natural Resources·Hawaii

71% match

Kikiaola Small Boat Harbor Hurricane Lowell Marg. Wharf Repair

Closes 11/6/2026Opened 10/14/2026

Alabama U.S. Marine Corps·Alabama

70% match

Roll Up Door Repairs at Fort Whiting, Mobile

Closes 11/10/2026Opened 10/30/2026

U.S. Department Of Homeland Security·Oregon

70% match

USCG STA COOS BAY (47302-47242) FY27 DD REPAIR

Closes 11/12/2026Opened 10/29/2026

Orange County Transportation Authority, CA·California

70% match

Roads, Parking Lots, and Signage Improvements at the Naval Weapons Station Seal Beach

Closes 11/16/2026Opened 9/28/2026

Massachusetts Department of Fish and Game·Massachusetts

70% match

PA-425 Plymouth Harbor Boat Ramp

Closes 11/17/2026Opened 10/15/2026

Ohio Department of Natural Resources·Ohio

70% match

Shawnee Marina Seawall Slip

Closes 11/19/2026Opened 10/26/2026

Port of San Diego·California

70% match

HARBOR POLICE HEADQUARTERS FACILITY IMPROVEMENTS

Closes 12/9/2026Opened 10/21/2026

U.S. Department Of Homeland Security·Louisiana

70% match

DRYDOCK REPAIRS FOR THE CGC PAMLICO

Closes 11/16/2026Opened 10/21/2026

Jacksonville Port Authority·Florida

70% match

BLOUNT ISLAND MARINE TERMINAL HANJUNG CRANE #8841 REFURBISHMENT

Closes 11/17/2026Opened 10/15/2026

Miami-Dade County·Florida

70% match

Multiple Marina Construction and Repairs - Central of Tamiami Trail to SW 120th Street

Closes 11/10/2026Opened 10/22/2026

U.S. Department Of Defense·Louisiana

70% match

Mermentau River Bar Channel Dredging, Mermentau River – Gulf of America, Maintenance Dredging, #26-1

Closes 10/1/2028Opened 9/1/2026

State of Hawaii Department of Transportation – Harbors Division·Hawaii

70% match

P10904 Domestic & Fire Waterline Systems Replacement Pier 51A

Closes 12/3/2026Opened 10/8/2026