This contract provides for the design, fabrication, removal, and installation of a complete interior signage and way‑finding system for the Terminal C garage at George Bush Intercontinental Airport. The scope includes demolition of existing signs, concrete surface preparation, installation of new aluminum and acrylic way‑finding signs, integration with existing parking guidance system hardware, night‑time work restrictions, and compliance with FAA, ADA, and local building codes. The City of Houston set a 30 % MWBE participation goal but did not reserve the award to any specific set‑aside category. The award was a single‑source, firm‑fixed‑price award to Intex United, Inc., valued at just under $2 million, with a contract performance period of 270 calendar days from notice‑to‑proceed.
• Replace all existing garage signage and add new way‑finding graphics.
• Perform selective demolition, concrete repair, painting, and installation of aluminum/foam‑board signs.
• Coordinate with airport security, TSA, and the existing digital parking guidance system.
• Meet strict night‑work windows and deliver a one‑year defect‑correction warranty.