The Meydenbauer Basin NE 8th Street and 100th Avenue NE, Flood Control Project involves the installation of storm drain pipes, manholes, catch basins, and other infrastructure improvements. The project also includes temporary traffic and pedestrian control, minor water system piping improvements, and potholing existing utilities. The engineer's estimate for the project is between $3,082,860 and $3,767,940. The contract was awarded to Shoreline Construction for a total amount of $3,113,848.50.
• The project includes the installation of approximately 2,400 feet of 30-inch diameter storm drain, 700 feet of 12-inch and 18-inch diameter storm drain, and associated excavation, shoring, dewatering, manholes, catch basins, lateral piping, bedding, and backfill materials.
• The project also includes temporary traffic and pedestrian control during construction of the storm system improvements.
• Minor water system piping improvements, including asbestos cement pipe removal and replacement with ductile iron pipe, are also part of the project.
• Potholing existing utilities, avoiding utility conflicts, and providing temporary support for utilities within the excavation are also included in the project scope.
• Roadway pavement, concrete curb/gutter, and sidewalk restoration along the storm drainage route are also part of the project.
• The installation of traffic signal video detection is also included in the project.