The Elk Grove-Florin Road Bridge and Widening Project involves the construction of a new bridge on Elk Grove-Florin Road over Elder Creek and the widening of Elk Grove-Florin Road to four lanes from Gerber Road to Florin Road. The project includes clearing and grubbing, bridge and retaining wall construction, creek channel excavation and construction, pavement removal, tree stump removal, bridge removal, roadway excavation, installation of curb, gutter, sidewalk, placement of aggregate base, asphalt concrete, slurry seal, striping, median construction, installation of landscaping and associated irrigation, installation of potable water main, storm drain, and traffic signal installation. The estimated construction cost is $14,960,000.00. The contract requires a General Engineering Contractor, Class A license.
• The project involves multiple tasks, including bridge construction and road widening
• The estimated construction cost is $14,960,000.00
• The contract requires a General Engineering Contractor, Class A license
• The project includes various aspects, such as landscaping, irrigation, and traffic signal installation