Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Alaska guideAlaska Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Alaska
  4. ›Engineering Services
  5. ›Ambler Access Project: Design, Hydrologic & Hydraulic…

Awarded contract·Alaska Energy Authority·Alaska

Ambler Access Project: Design, Hydrologic & Hydraulic Analysis, and Survey

Won by HDR Alaska, Inc.$5MSingle Award
Contract source

Awarded vendors

  • HDR Alaska, Inc.

Description

The Ambler Access Project contract tasks HDR Alaska, Inc. with comprehensive professional services to design a 211‑mile gravel road connecting the Dalton Highway to the Ambler Mining District, including runway, bridge, and culvert design, hydraulic and hydrologic analyses, and detailed land‑survey work. The agency AIDEA will fund the effort under a multi‑year performance period (June 2021‑Dec 2024) and may select among several pricing mechanisms (fixed‑price, cost‑reimbursement, etc.). The solicitation required Alaska‑registered staff, detailed technical proposals, and certifications for insurance, licensing, and minority‑business participation. • Scope: Roadway, bridge, runway, culvert design plus H&H analysis and surveying. • Duration: Approximately 3½ years (June 2021‑Dec 2024). • Procurement: Competitive sealed bids with technical evaluation weighting (staff, methods, past performance, MBE, Alaska preference).

Attached files

Key dates

Bids closed
6/4/2021
Contract modified
5/21/2021
Starts
6/1/2021
Ends
12/31/2024
Duration
42 months

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Engineering Services
NAICS
541330
Solicitation №
RFP 21101

Contract value

$5,000,000

The solicitation lists multiple budget brackets ranging from “Less than $100,000” up to “$1 M or greater,” indicating the agency anticipates a contract that could exceed $1 M. Designing a 211‑mile road with bridges, runways, culverts, hydraulic modeling, and extensive surveying is a large‑scale civil‑engineering effort. Comparable Alaska road‑design contracts of similar length and complexity typically fall in the $3‑7 million range. Considering the need for multiple engineering disciplines, field surveys, and possible subcontracting, a reasonable ballpark estimate is roughly $5 million. This estimate assumes a mid‑range cost‑reimbursement or fixed‑price arrangement and reflects typical labor rates, equipment, and overhead for such projects in Alaska.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Pennsylvania Department of Environmental Protection·Pennsylvania

Top match · 71%

AMR, Beulah Rd Wilkins Twp. (Lucia Dr), Allegheny

Closes 11/12/2026Opened 10/16/2026

Wyoming State Construction Department·Wyoming

69% match

AML Project 87, Phase I – Hanna Roadway Infrastructure Repair - Dept of Environmental Quality

Closes 12/9/2026Opened 10/23/2026

Pennsylvania Department of Environmental Protection·Pennsylvania

69% match

AMRP, Rocky Glen Pond, Moosic Bgh, Lackawanna Cnt

Closes 12/3/2026Opened 10/30/2026

Pennsylvania Department of Environmental Protection·Pennsylvania

69% match

AMR, Cambria & Westmoreland Cnties

Closes 11/12/2026Opened 10/16/2026

U.S. Department Of Defense·Missouri

69% match

Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)

Closes 5/27/2027Opened 5/27/2026

Laramie Rivers Conservation District·Wyoming

69% match

Laramie River - Hart Ranch Restoration

Closes 11/8/2026Opened 8/27/2026

County of Ontario·New York

69% match

Geneva Drinking Water Plant Floodplain Restoration Project Feasibility Study

Closes 12/15/2026Opened 10/15/2026

West Virginia Department of Environmental Protection·West Virginia

69% match

AML- Simpson Creek Highwall, Tipple and Portals Phase II

Closes 11/23/2026Opened 10/26/2026

Colorado Department of Natural Resources (DNR)·Colorado

69% match

Evaluation of Hydrology & Water Availability 15MR CO River

Closes 11/18/2026Opened 10/30/2026

West Virginia Department of Environmental Protection – Office of Abandoned Mine Lands & Reclamation·West Virginia

68% match

AML - Summerlee AMD Treatment

Closes 11/12/2026Opened 10/6/2026

Orange County, Florida·Florida

68% match

Bonnie Brook Subdivision Drainage Improvements Engineering Design Services

Closes 11/17/2026Opened 10/15/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

68% match

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

U.S. Department Of Defense·Kentucky

68% match

Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020

Closes 11/6/2026Opened 10/9/2026

Maryland Mayor and Town Council of Oakland·Maryland

68% match

PROFESSIONAL ENGINEERING SERVICES OAKLAND WATER SYSTEM COMPREHENSIVE ENGINEERING & INFRASTRUCTURE PLAN, PHASE I

Closes 11/9/2026Opened 10/9/2026

Pennsylvania Department of Environmental Protection·Pennsylvania

68% match

AMLRP w/ PTS, State Game Lands 332, Indiana Cnty

Closes 11/12/2026Opened 10/16/2026

West Virginia Department of Environmental Protection·West Virginia

68% match

AML- Bridgeport (Tomes) Landslide

Closes 11/4/2026Opened 9/18/2026

West Virginia Department of Environmental Protection·West Virginia

68% match

AML - Shinnston (Sheppard) Mine Drainage

Closes 11/20/2026Opened 10/14/2026

City of Santa Rosa·California

68% match

Bennett Valley Golf Course Irrigation System Improvements

Closes 11/5/2026Opened 10/6/2026